​Floating Work Platforms

​CHRISTMAS ISLAND MOORINGS 2008
Scope of works:
 Deep water moorings construction and installation for the Australian Federal Government.This challenging project required the transportation of a complex and extremely heavy mooring system from Fremantle WA to Christmas Island followed by deployment of 2 ships moorings and buoys in 450m of water.  The Islands extremely steep drop off right along side the Phosphate Loading Facility made this a most challenging and interesting job.
​Vessels/equipment engaged:
  • Tug Global Rotor
  • Giant Multicat Global Constructor
Picture
Picture
Picture