Global Marine & Engineering were contracted by Main Roads WA to undertake steel replacement and abrasive blasting/painting of sections of bridge works that had been exposed due to cyclonic floods washing the bridge abutments away. This urgent and vital project was finished on time and budget with great appreciation by the client.
Vessels/equipment engaged:
Vessels/equipment engaged:
- Crane Trucks
- Welding Plant
- Abrasive Blasting and Painting Equipment