Scope of works:
Another project for Main Roads WA. 8 bridge support piles in a fast flowing river were found, after construction to need protection from corrosion and abrasion. Global Marine & Engineering were called in to look at how it could be done in such fast moving water and tidal ranges of over 5 meters.
A system of cofferdams and pumps were used to allow concrete to be poured to above low tide level and Denso wrapping along with UHMWPE cover sheeting applied above.
A 10 yr guarantee was supplied and all is still in excellent condition at last inspection.
Scope of works:
Another project for Main Roads WA. 8 bridge support piles in a fast flowing river were found, after construction to need protection from corrosion and abrasion. Global Marine & Engineering were called in to look at how it could be done in such fast moving water and tidal ranges of over 5 meters.
A system of cofferdams and pumps were used to allow concrete to be poured to above low tide level and Denso wrapping along with UHMWPE cover sheeting applied above.
A 10 yr guarantee was supplied and all is still in excellent condition at last inspection.
MAITLAND RIVER BRIDGE REPAIRS AND MAINTENANCE
Scope of works:
Global Marine & Engineering were contracted by Main Roads WA to undertake steel replacement and abrasive blasting/painting of sections of bridge works that had been exposed due to cyclonic floods washing the bridge abutments away. This urgent and vital project was finished on time and budget with great appreciation by the client.
Scope of works:
Global Marine & Engineering were contracted by Main Roads WA to undertake steel replacement and abrasive blasting/painting of sections of bridge works that had been exposed due to cyclonic floods washing the bridge abutments away. This urgent and vital project was finished on time and budget with great appreciation by the client.